-
Aluminium Square Truss
-
Aluminium Spigot Truss
-
Lapisan truss
-
Folding Truss
-
Platform Tahap Aluminium
-
Berputar dan Angkat
-
Crowd Control Barrier
-
Sistem Menara Truss
-
Aksesoris Truss
-
Speaker Truss
-
Tujuan posting truss
-
Stage Roof Truss
-
Kotak Aluminium Truss
-
Menara Perancah Aluminium
-
Tenda Struktur Aluminium
-
Ian Morrisonjoy in learning about Ledika's excellent staging material.
-
AtmajyotiGood quality with good service, so nice !
-
KukuTruss sangat mudah dipasang dan dilepas.
Exhibit Truss Heavy Duty Box Aluminum Spigot 20m - 40m Span

Hubungi saya untuk sampel gratis dan kupon.
ada apa:0086 18588475571
Wechat wechat: 0086 18588475571
Skype: sales10@aixton.com
Jika Anda memiliki masalah, kami menyediakan bantuan online 24 jam.
xThickness of Main Tube | 4mm | Diameter of Main Tube | 50mm |
---|---|---|---|
Usage | Hang audio, speaker,lighting | characteristic | Folding, Convenient carriage |
Span | 20-40m | Terms | EXW,FOB,CIF,CFR |
Loading Port | Guangzhou / Shenzhen | ||
Menyoroti | foldable truss,exhibit truss |
Folding Truss Heavy Duty Box Aluminum Spigot 20m - 40m Span Truss
Specification
Item NO. | Main Tube | Joint | Brace Tube | The largest of loading | Span/M |
FT5247 | 50x4mm | 60mm spigot | 30x2mm | 59kg/m | 20 |
FT5295 | 50x4mm | 60mm spigot | 30x2mm | 29.3kg/m | 36 |
Some detail
For Car Show
Company Profile:
LEDIKA is a professional manufacturer in stage equipment in Panyu, Guangzhou, Guangdong, China.
Through 15 years development, we are becoming an integrative company on aluminum truss, layer truss, LED lighting, stage and flight case, professionally in studying, designing, producing, renting and mounting together.
"LEDIKA"approached its brand and own its wide market. We participated in the builder of 2007 Special Olympics Games Opening Ceremony,2008 Beijing Olympics Games, 2010 the 16th Asian Games.
Honesty, humanist and innovation are our base to develop.
FAQ
1,Q:Where's your factory?
A:Our factory is loaded in Panyu District,Guangzhou City, China.
2, Q: What's your Delivery?
A: It's about 20-30 days.
3, Q:What's your loading port?
A: Guangzhou / Shenzhen Port.
4,Q:What's your payment?
A: 50% deposit, the balance should be paid before delivery.